Case Study

Sontex Meters installed on Hardwick Hall Project

14 May 2019

Project – Hardwick Hall, Elizabethan Country House at Doe Lea, Chesterfield S44 5QJ

Project Start date – 05/07/2018

Completion – Scheduled for Late November 2018

Biomass Installer - Total Biomass


DMS Metering Solutions supplied the Sontex range of Heat Meters to the Hardwick Hall project. The project entailed removal of the existing biomass boilers to then be replaced with 2 ETA 200KW boilers. 

The main Hardwick Hall, the restaurant and the holiday cottages are being serviced by the new district heating system.

Total biomass also installed a number of UnicoCoder hot water meters, with an M-Bus output to log the data of the hot water usage for Hardwick Hall, this was also supplied by DMS.

If you would like to discuss a project requiring data logging, biomass or district heating systems please contact our office – 01773 534555 or email meters@dmsltd.com


Sontex Meters installed on Hardwick Hall Project


Achilles UVDB Stamp Silver Plus
British Chambers of Commerce
CPD
CPD
Construction Online
DMS LTD Create Membership Member
EUA Utility Networks
GSHPA
Honney wells
Heat Pump Federation
IGEM Industrial Affiliate
ISO-9001 CERTIFICATION
UKDEA
New Member Logo DNCC 2023